Milestone 1 - Calibration operations + SLO publish + runbook v1 (Blueshift-covered month, $500 delta)
Continuous operation of the CalibrationNet stability surface - the SP test target ( t0143103 , held under 1/3 QAP), the Plumbline faucet (tFIL + USDFC), Calix nv-upgrade validation, and daily network monitoring - plus formalising public SLOs , a public status page , and starting…
Milestone 2 - Calibration operations + on-ramp tooling (Blueshift-covered month, $500 delta)
Continuous operation of the surface for August, plus shipping the quick on-ramp tooling and a public builder API for calibration funding/status, and keeping the runbook current. Funding note. August maintenance is funded by the Blueshift side letter at $3,500/mo - its final cover…
Milestone 3 - Full operational ownership begins (Blueshift wound down, full rate)
First month of full ProPGF funding. The Blueshift side letter winds down Sept 1, 2026; from here ProPGF is the sole funder of the surface at the full $4,000/mo target. This is the clean successor seam - same operator, same services, continuous delivery, funding handed off from th…
Milestone 4 - Operations + nv upgrade validation + on-ramp hardening (full rate)
Continuous operation at full rate, focused on hardening the on-ramp + builder API on real usage, and executing any nv validation that lands. Concrete tasks Continuous operation of all services against SLOs. Harden the on-ramp tooling + builder API on the first two months of real…
Milestone 5 - Operations + mainnet USDFC preview + builder API v1 + successor-operability check (full rate)
Continuous operation at full rate, plus three items. (a) Mainnet USDFC + tFIL preview on Plumbline. Plumbline is already the default calibration funding endpoint for SynapS3. This deploys the same dual-asset dispenser against mainnet contracts - capped-exposure policy (e.g. 5 USD…
Milestone 6 - Operations + final runbooks + 6-month sustainability report (full rate)
Final month at full rate. Continuous operation plus closing the grant out with the finalised operations runbooks (maintained since M1, not built cold here) and a 6-month sustainability report a reviewer can verify the whole grant against. Concrete tasks Continuous operation of al…
Filecoin ProPGF Batch 3
Plumbline ( github.com/Reiers/plumbline ) is the operational stability layer for the Filecoin CalibrationNet, run by TSE Reiersen (Org. 929 074 912). This proposal funds 6 months of operational ownership of that surface, plus the new builder on-ramp + API roadmap. It is the succe…